Aaro were engaged by Water Corporation to demolish an existing drainage outfall structure on the Waikiki beachfront and replace with an engineered modular precast outfall structure, which tied into new piles and the existing drainage pipe.
Through strategic planning surrounding public interface, environmental impacts, weather, tides, dewatering and bypassing, the project was coordinated and delivered with precision and to specification.
As a one-stop-shop provider of all the pre-cast components, we were relied upon heavily in the design stages to provide input on overcoming some minor design challenges. Our team of highly qualified drainage experts was ready to take on this project from start to finish through detailed planning and quality project management.
CCTV Survey Inspection
Waikiki Main Drain Ocean Outfall Replacement
From planning to execution amidst environmental challenges, it was more than a day at the beach for Aaro in providing a complete solution for Water Corporation down in Waikiki$700k
Client
Water CorporationLocation
WaikikiProject Duration
2 MonthsProject Start
December 2022Project Finish
January 2023RelatedProjects
We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.
Our experts can make your next project a success.
Discover how Aaro could provide you with expert solutions backed by experience.