Waikiki Main Drain Ocean Outfall Replacement

From planning to execution amidst environmental challenges, it was more than a day at the beach for Aaro in providing a complete solution for Water Corporation down in Waikiki

Aaro were engaged by Water Corporation to demolish an existing drainage outfall structure on the Waikiki beachfront and replace with an engineered modular precast outfall structure, which tied into new piles and the existing drainage pipe.
Through strategic planning surrounding public interface, environmental impacts, weather, tides, dewatering and bypassing, the project was coordinated and delivered with precision and to specification.
As a one-stop-shop provider of all the pre-cast components, we were relied upon heavily in the design stages to provide input on overcoming some minor design challenges. Our team of highly qualified drainage experts was ready to take on this project from start to finish through detailed planning and quality project management.

→ Download the Project Brief

$700k

Client

Water Corporation

Location

Waikiki

Project Duration

2 Months

Project Start

December 2022

Project Finish

January 2023

RelatedProjects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

$140kCleaning and CCTV Investigation of CulvertsCCTV Survey Inspection, High Pressure Jetting
Before Queensland Rail could refurbish 24 culverts, they needed to understand the condition they were in. The Aaro team were able to clean, investigate and report back to Queensland Rail, using machinery and equipment on hand.
Townsville, QLD

Our experts can make your next project a success.

Discover how Aaro could provide you with expert solutions backed by experience.

Get in touch
One group, many services