One group, many servicesOne group, many services
UV CIPP Relining

Stormwater CCTV and Inspection | Paraburdoo

Utilising cutting-edge software with our CCTV Inspection Technology and experience in the North West, Aaro were able to provide a complete solution for the Shire of Ashburton in a project covering 5km.

Aaro were pleased to be awarded the contract for the CCTV and Inspection contract for the Shire of Ashburton. The works involved mobilising to the town of Paraburdoo to complete 4997m of CCTV asset condition assessment surveys.

The purpose of the project survey was to complete 10 area plans using data software WinCan VX within Australian standards WSA 05-2020 to establish the following:

  • Location, accessing and inspection of stormwater assets
  • Asset data collection (diameter, shape, material)
  • Defect identification and grading
  • Condition and Serviceability assessment and rating

The Shire would then use the data to support them in their maintenance planning for 2023/24.
Aaro successfully delivered the works earlier than expected and this resulted in a cost-saving for the Shire. And were able to complete the data reports before the practical completion date.

→ Download the Project Brief

$78k

Client

Shire of Ashburton

Location

Paraburdoo, WA

Project Duration

1 Month

Project Start

June 2023

Project Finish

June 2023

RelatedProjects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

$2.3mBrisbane Stormwater Rectification Stage 3UV CIPP Relining
Port of Brisbane and Aaro partnered up for the next phase of this massive project, covering full CCTV assessment, design, relining and full reinstatement.
Brisbane, QLD

Our experts can make your next project a success.

Discover how Aaro could provide you with expert solutions backed by experience.

Get in touch
One group, many services